Urgency and Complexity in Old City Renovation
In 2024, a large-scale urban renewal project was launched in downtown Dar es Salaam, Tanzania, aimed at improving infrastructure, easing traffic congestion, and building new commercial facilities. Located in the busy Vingunguti area, the project faced tight schedules and complex geological conditions, demanding high mobility, durability, and efficiency from construction equipment.
After multiple rounds of evaluation, the client selected Voto Limited as the core equipment supplier, purchasing and leasing several medium and large hydraulic excavators to undertake major excavation, demolition, and site leveling tasks.
Performance Matching and Fast Delivery
The project had two strict equipment requirements: first, the initial batch had to be delivered within 10 days; second, the machines needed excellent fuel efficiency and adaptability to various operating conditions. Voto Limited provided excavators sourced from international brands like Volvo and Sinomach, with full factory certifications and accessories.
Thanks to a well-established logistics system, all equipment was delivered and deployed within 5 days, significantly ahead of schedule, giving the construction team valuable preparation time.
Compatibility and Reliable Supply
The project lasted 8 months, requiring continuous stable operation of equipment. Voto Limited supplied original-standard bucket teeth, hydraulic hoses, filters, and track assemblies, with on-site spare parts ready for different construction stages.
All parts were 100% compatible with the main systems, ensuring precise assembly and quick response, effectively preventing secondary failures or downtime caused by incompatibility.
On-site Technical Team + 24-Hour Emergency Response
To minimize the impact of unexpected breakdowns, Voto Limited assigned two professional after-sales engineers on site and equipped a mobile service vehicle for routine inspections and urgent repairs. Routine maintenance included hydraulic system checks, engine upkeep, and fluid replacement.
During the project, 12 minor failures were handled, all within 3 hours, maintaining over 95% equipment uptime, winning consistent praise from the construction team.
Rental-Purchase Combination to Reduce Financial Pressure
Considering the client’s limited early budget, a flexible plan of “main equipment rental + core parts purchase” was offered, ensuring ownership of critical equipment while reducing upfront capital expenditure.
According to client feedback, this model saved about 22% in early costs and was continued in subsequent project phases.
Completed 15 Days Ahead of Schedule
Thanks to stable and efficient equipment support and comprehensive services, the urban renewal project completed its milestones 15 days early. The client highlighted Voto Limited’s equipment stability and quick service as key factors for on-time delivery.